Work continues on the Hagfors Center this week, both inside the building and on the construction site. This week’s updates includes information about the following:
> The elm wood wall (including a photo)
> Lobby work
> Skyway connection
> Other interior work (including a photo of an interior corridor under construction)
> Outdoor stairs
> Screen for the electrical yard (photo included)
> Site work for the storm water basin
> Color accent on the flexible classroom space
Go to http://www.augsburg.edu/hagforscenter to sign up for future email updates.