An early morning shift was part of the work last week to position the main ceiling lights in the lobby to illuminate the 2-story elm wood wall. This week’s update includes pre-dawn photos of the warm glow of the lights from inside the lobby and outside the building. The post also includes photos and updates on the following:
> The lobby ceiling
> The electrical yard on the north side of the building
> Site work, including a photo of the exterior stairs and sidewalk on the north end of the construction lot
> Interior work, including a photo of the 4th-floor boiler room

Go to http://www.augsburg.edu/hagforscenter to sign up for future Hagfors Center email updates.

See the full Hagfors Center summary for the week of June 19, 2017.