submitted by peacock@augsburg.edu
In 2019 a truck hit the pedestrian bridge over I-94 near the Augsburg campus, damaging it beyond repair. A temporary bridge was installed at that time. The Minnesota Department of Transportation (MNDOT) is now in the process of planning and designing a permanent bridge. MNDOT is hosting a public meeting about the pedestrian bridge project on Thursday, June 27th from 4:30PM – 6:30 PM at the Brian Coyle Center (420 15th Ave. S.). Stop by to learn about the project and to provide input about the features you’d like to see incorporated in the design for the new bridge. You can also share feedback about the bridge project by completing MNDOT’s online survey (see link below).