submitted by sitarami@augsburg.edu
MnDOT has had the 25th Avenue bridge fully closed for several weeks after a truck struck one of the beams. MnDOT opened the north side to traffic but the southbound side will remain closed at least until mid-October. It will require a more significant repair. MnDOT apologizes for the inconvenience.